Fall River turbine visible sign of future

The 2 megawatt wind-energy generator just erected at Fall River’s Philips Lightolier manufacturing facility is projected to fill up to 70 percent of the electricity needs of the plant, which manufactures fluorescent lighting and lighting systems. More
This item is available in full to subscribers. If you are a current subscriber, log in to continue.

You can access an additional 12 stories by registering for a free account. Click here to continue.

Otherwise, purchase a subscription to continue.

You can also purchase this single article, if you prefer. Click here to continue.
PBN Editorial

Fall River turbine visible sign of future

Posted 2/20/12

The 2 megawatt wind-energy generator just erected at Fall River’s Philips Lightolier manufacturing facility is projected to fill up to 70 percent of the electricity needs of the plant, which manufactures fluorescent lighting and lighting systems.

The turbine represents an investment in excess of $4 million by Philips. But it could not have been completed without an additional $540,000 in grants from the Massachusetts Clean Energy Center, and as such, it stands as a testament to the positive outcomes that public investment can have.

As Mass. Gov. Deval L. Patrick noted at the windmill’s dedication, the Lightolier turbine helps the state get out from under the grip of volatile fossil-fuel prices while helping it develop a renewable energy sector and grow jobs.

Rhode Island has made similar investments (including for the Portsmouth High School wind turbine), but it is important to note that the state is still a long way off from being big player in the industry. The potential for more growth is great, as is the challenge to continue investing in a sustainable future. •

No comments on this story | Add your comment
Please log in or register to add your comment
Calendar
PBN Hosted
Events

The 2nd Annual Healthiest Employers event will recognize employers who have strong, effective Health and Wellness programs in the region. Deadline for enrollment is June 28th.
Advertisement
National
Local
Latest News